Warranty: | One Year |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Mould Cavity: | Multi Cavity |
Plastic Material: | ABS |
Process Combination Type: | Compound Die |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Baby car seat mold, Car safety seat chair mold, High-quality car seat mold, Guangdong baby seat mold, Car seat chair mold manufacturer, China car seat mold supplier,Car seat mold factory, Customized baby seat mold Injection molded car seat chair , Durable car seat mold, baby safety seat mold, baby seat mold for car,Baby safety seat mold.
Green Vitality was founded in 1993, as starting from CNC processing in a small tooling building in Chang'an town, with nearly 30 years experience in custom tooling and injection molding, nowadays we have become one of the global famous mold makers in manufacturing large plastic injection molds.
With the modern business management system and ISO9001:2015 Quality System guideline, the sophisticated production techniques, the advanced manufacturing equipment, and our qualified and dedicated team, we are full of capabilities and have great confidence in offering you professional one-stop solution of mold designing, mold making, injection molding and beyond-value service.
Green Vitality make over 400 molds per year, mainly of the molds and plastic parts are exported to America, Germany, France, Spain, Italy and other countries worldwide.
Green Vitality make lots of plastic injection moulds and the application is widely used.
Mold application: Auto parts mould, household mold, home appliance mould, daily commodity mold, toilet mold, bathroom mold, industrial mould, electronic products mould, medical device mould, ocean and vessel mould, package mould, pipe fitting mould, computer parts mould, toys mould etc.
Automotive | Auto interior plastic case, Auto inner parts, Bumper, Door plate, Lamp shell, Instrument panel, auto connectors , Electrical switch; Car gear, Complete sets of motorcycle parts; | |||||||||||||
Electronic | Wireless receiver plastic part, 3G/4G Modem Wireless Network Cards, USB Connector, USB housing, Mobile phone plastic part, remote control, key-press; | |||||||||||||
Mechanical | Motor support plastic part, Pump plastic part, mower plastic parts; industrial gear, mechinery enclosure, engine hood, radiator, filter; | |||||||||||||
Household |
Small household appliance, Juicer, High speed blender, Some small plastic parts; daily necessity, kitchen ware, cooking pot, air fryer; | |||||||||||||
Home appliance | TV front cover, TV rear cover, Display cover, Air-conditioner or Refrigerators plastic parts, Washing machine part; | |||||||||||||
Medical | Hollow fiber dialyzer, Deaf-aid parts, Medical instrument body plastic parts, Blood-pressure meter parts, Blood-pressure meter, Stapler. |
Injection Plastic Molding Samples display:
Plastic material used are: ABS, PA, PC, PP, PE, PET, PETG, PS, AS, ASN, POM, PEEK, PBT, PSU, PVC, TPU, TPE, TPR, PC+ABS, PA+GF, PC+GF, POM+GF, PBT+GF, etc.
Customers visiting and Team Activity:
Below is a list of answers to most frequently asked questions about Green Vitality.
Q1: Are you trading company or manufacturer?
A1: We are direct factory for making mould with experience for 30 years.
Q2: Where is your factory located?
A2:Green Vitality is located in Shajing, Shenzhen City, Guangdong Province, China.
40 minutes from Bao 'an International Airport by car, 45 minutes from train station to our factory.
Q3: What we need for mould quote?
A: Usually we need the following information,
(1) Mould steel raw material you require or mould life you require.
(2) Mould cavity no. you want?
(3) 2D or 3D product drawing, or pictures with detail sizes information (length, width, height, thickness), or send samples directly to us.
(4) Raw material of the product.
(5) Hot runner or cold runner, if hot runner which brand of hot runner you require.
Q4: How about quality control in your factory?
A: We believe "Quality comes before everything". We mainly do the following procedures:
(1) Design Optimize Control
(2) Mould steel hardness Inspection
(3) Mould assembly Inspection.
(4) Mould trial samples inspection.
(5) Final inspection for mould & packing before shipment
Q5: How long is the lead time for a mould?
A5:It depends on the mould's size and complexity. Usually, the lead-time is about 25-45 days.
Please send 3D/2D drawings or samples to us if you have any queries with regards to the above.
Through streamlining the production of molds, we can help you cut cost up to 50%!
Welcome your visit our company.
It's our pleasure if we are able to work together with you to provide the value added service and help to make the optimum mold solution & product.
Suppliers with verified business licenses