After-sales Service: | One Year |
---|---|
Material: | Plastic |
Shape: | Universal |
Hinge Material: | Plastic |
Feature: | Slow-Close Toilet Seats |
Length: | 480MM |
Customization: |
---|
Suppliers with verified business licenses
Product Name | Plastic injection mould for bathroom toilet shower head |
Part Material | ABS |
Part Size | 160*152*152mm |
Application | Bathroom toilet shower |
Mold Size | 450*1100*510mm |
Mold Weight | 820KG |
Mold Steel material | S136 |
Mold Cavity Number | 1*2cav |
Surface finish | Polishing |
Feed System | Cold runner |
Injection Cycle | 30s |
Injection Machine | 250T |
Mold Feature | Perfect joint line, Long stroke of Slide, High assembly requirement |
Internal Mold Number | GV210601-GV210605 (Five molds totally) |
Green Vitality was founded in 1993, as starting from CNC processing in a small tooling building in Chang'an town, with nearly 30 years experience in custom tooling and injection molding, nowadays we have become one of the global famous mold makers in manufacturing large plastic injection molds.
With the modern business management system and ISO9001:2015 Quality System guideline, the sophisticated production techniques, the advanced manufacturing equipment, and our qualified and dedicated team, we are full of capabilities and have great confidence in offering you professional one-stop solution of mold designing, mold making, injection molding and beyond-value service.
Green Vitality make over 400 molds per year, mainly of the molds and plastic parts are exported to America, Germany, France, Turkey, Italy and other countries worldwide.
Quality Assurance:
The quality control procedure and management system are strictly carried out according to ISO9001:2015 system in Green Vitality.
Green Vitality uses professional form and graphics such as BOM of mould, Weekly Report with pictures, Injection Parameter Report, Dimension Report and so on to manage all of projects running process.
Quality inspection guidelines are tailored to meet specific customer requirements.
Plastic Injection Moulds Display:
Molds we make are usually injection plastic mould including cold runner mold, hot runner mold, double shot mold, over mold, insert mold, automatic thread demoulding mold, hydraulic mold, reverse mold, stacking mold, as well as big blow mold, gas assist mold, BMC mold, vacuum thermoforming mold, die casting mold, gas assist mold etc.
We use original branded raw material to produce high quality plastic parts with advanced equipment.
Brands we use are Sabic, Dupont, Chimei, Toyolac, Arkema, Formosa, Sumitomo, LG etc.
Wide variety of polymer plastic materials are used ABS, PP, PC, PE, PA, POM, PMMA, PET/ PETG, PEEK, PS, PVC, PEI, AS, ASA, PPA, PPO, PCTG, PSU, SAN, HIPS, TPE/TPU/TPR, PBT, PC+ABS, PP+GF, POM+GF, PC+GF, PA+GF, ABS+GF, PBT+GF, PSU+GF etc.
Transportation and shipping:
FAQ
Below is a list of answers to most frequently asked questions about Green Vitality.
Q1: Are you trading company or manufacturer?
A1: We are direct factory for making mould with experience for 30 years.
Q2: Where is your factory located?
A2:Green Vitality is located in Shajing, Shenzhen City, Guangdong Province, China.
40 minutes from Bao 'an International Airport by car, 45 minutes from train station to our factory.
Q3: What we need for mould quote?
A: Usually we need the following information,
(1) Mould steel raw material you require or mould life you require.
(2) Mould cavity no. you want?
(3) 2D or 3D product drawing, or pictures with detail sizes information (length, width, height, thickness), or send samples directly to us.
(4) Raw material of the product.
(5) Hot runner or cold runner, if hot runner which brand of hot runner you require.
Q4: How about quality control in your factory?
A: Our quality policy is "Quality first, Customers first".
We comply with ISO9001:2015 to ensure every link is well controlled, we mainly do the following procedures:
(1) Design Optimize Control, make DFM analysis to ensure the part drawing is in the optimal design.
(2) Mould steel hardness Inspection to make sure the steel we use are the same as customers requirement.
(3) Mould assembly Inspection to ensure the mould is in good fitting.
(4) Mould trial samples inspection to make sure the product is within the tolerance and reach customer requirement.
(5) Final inspection for mould & packing before shipment to ensure the mold is intact, running smoothly and safety packed for shipping.
Q5:How long is the lead-time for a mould?
A5:It depends on the mould's size and complexity. Usually, the lead-time is about 30-45 days.
Q6: What is your payment term?
A6: We usually use T/T, 40% prepayment, 40% upon 1st trial sample, 20% sample confirmed and before shipping.
For specific customer we can discuss it.
Welcome your visit our company.
It's our pleasure if we are able to work together with you to provide the value added service and help to make the optimum mold solution & product.
Suppliers with verified business licenses