Warranty: | One Year |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Mould Cavity: | Multi Cavity |
Plastic Material: | PP |
Process Combination Type: | Compound Die |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Product Name | Plastic injection mould for storage box container |
Part Material | PP |
Part Size | 500*450*400mm |
Part Weight | 520g |
Application | Home, Hotel, Restaurant, Supermarket, Shop, Hospital, School, etc |
Mold Size | 850*800*660 mm |
Mold Weight | 3400KG |
Mold Steel material | NAK80 |
Mold Cavity Number | 1*1 cav. |
Surface finish | Polishing |
Feed System | Cold runner |
Injection Cycle | 50s |
Injection Machine | 750T |
Mold Life | 800,000 shots |
Package | Pre-wood case with vacuum packing |
Export Country | USA |
Green Vitality certified with ISO9001:2015, adopt 5S roles to manage all production and acvitity.
We offer customers DFM Analysis, Mould Flow Analysis,Project Weekly Report, Injection Parameter Report, Dimensional report, so they can optimize the product and know mold processing progress, get approved samples and know well how to set injection parameter for mass production in the best condition to get the perfect products.
About us:
Green Vitality was established in 1993 with 6 employees. With the development for 30 years, we have become a reliable supplier as well as a strategic partner of customers worldwide to provide the most efficient solutions for their applications for plastic products. We will continue the mission to be a world-class expert in mold making industry.
Our service scope includes product design optimization, DFM analysis, Mold Flow analysis, mold design, mold making, plastic parts injection molding, surface treatment, assembly, lableing and packing.
We always offer turnkey solution to our customers, helping them use least time and least money to get most efficient and best quality products. Welcome your contacts, visits and cooperations.
Company Photos:
Workshops:
We use state of art technology, in-house mold design and mold making, 23sets injection molding machines from 80T-400T with robot arm to meet customers high production demand, two shifts 24h*6days.
Mould Manufacturing Work Flow:
Step#0: To prepare quotation for evaluation according to customers' drawings or samples.
Step#1: When project kick off, our engineer team will hold an internal meeting to review the project requirements, and provide DFM analysis or Mold Flow analysis for double checking of the key data, to avoid any misunderstanding or potential risks.
Step#2: We will draft the mold drawing after DFM confirmed, so you would have an idea about the mold structure and dimension.
Step#3: During the mold machining, we will keep close communicate with you, and send Mold Progress Report weekly. Then you can know about the project progress timely.
Step#4: After finishing the mold, we will test the mold, and provide samples for you to test the part quality / function /
Assembly. You can give us your feedback if any problem for us to improve. Mold Test Report, Part Dimensional Report, Tooling Evaluation & Approval Report would be provided.
Step#5: Only getting your confirmation, we will arrange shipment.
Step#6: Our engineer team is always on the service to your technical support.
Post Molding Service:
Core Advantage of Green Vitality
The injection molded parts we make ranging from different industries, auto parts, home appliance, electronic products, industrial products, daily commodities, sanitary, machinery parts, medical device, toys and many other industries.
We use original branded plastic material to produce high quality plastic molded parts with advanced injection molding machines and automatic production equipment and robot arm.
Plastic material brands we use are Sabic, Dupont, Chimei, Arkema, Formosa, Sumitomo, LG etc.
Plastic raw materials are ABS, PP, PC, PE, PA, POM, PMMA, PET/ PETG, PEEK, PS, PVC, PEI, AS, ASA, PPA, PPO, PCTG, PSU, SAN, HIPS, TPE/TPU/TPR, PBT, PC+ABS, PP+GF, POM+GF, PC+GF, PA+GF, ABS+GF, PBT+GF, PSU+GF etc.
Q1: Are you trading company or manufacturer?
A1: We are direct factory for making mould with experience for 30 years.
Q2: Where is your factory located?
A2:Green Vitality is located in Shajing, Shenzhen City, Guangdong Province, China.
40 minutes from Bao 'an International Airport by car, 45 minutes from train station to our factory.
Q3: What we need for mould quote?
A: Usually we need the following information,
(1) Mould steel raw material you require or mould life you require.
(2) Mould cavity no. you want?
(3) 2D or 3D product drawing, or pictures with detail sizes information (length, width, height, thickness), or send us samples directly.
(4) Raw material of the product.
(5) Hot runner or cold runner, if hot runner which brand of hot runner you require.
Q4: How about quality control in your factory?
A: We believe "Quality comes before everything". We mainly do the following procedures:
(1) Design Optimize Control
(2) Mould steel hardness Inspection
(3) Mould assembly Inspection.
(4) Mould trial samples inspection.
(5) Final inspection for mould & packing before shipment
Q5:How long is the lead-time for a mould?
A5:It depends on the mould's size and complexity. Usually, the lead-time is about 25-45 days.
Please send 3D/2D drawings or samples to us if you have any queries with regards to the above.
Through streamlining the production of molds, we can help you cut cost up to 50%!
Suppliers with verified business licenses