Warranty: | One Year |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Mirror Polishing |
Mould Cavity: | Multi Cavity |
Plastic Material: | PC |
Process Combination Type: | Compound Die |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Description | Car lamp enclosure plastic mould, car lamp mold, plastic injection mould for car parts |
Plastic material | PET, PC, PMMA |
Mould cavity&core steel | S136 |
Mould size | 600*660*566mm |
Mould weight | 1180KG |
Feeding System | Cold runner |
Nos of Cavity | 1+1 |
Manufacture time (day) | 45 days |
Mould life | 1,000,000 shots |
Packing | Vacuum + plywood wooden box |
Mould Material | Hardness | Mould Life |
P20 | HRC 28-33 | >300,000 shots |
718 | HRC 33-36 | >500,000 shots |
H13 | HRC >43 | >800,000 shots |
2344 | HRC >48 | >800,000 shots |
S136 | HRC 48-52 | >1,000,000 shots |
Mold Type | Single Cavity Mold, Multi Cavities Mold, Family Mold, Hot Runner Mold, Cold Runner Mold, Two-Shot Mold, Insert Mold, Overmold, Stack Mold, Automatic Thread Demoulding Mold, Reverse Mold, Gas Assist Mold, Precision Mold. |
Mold Standard | DME, HASCO, JIS |
Mold Base | DME, HASCO, FUTABA, LKM |
Mold Components | DME, HASCO, JH, HPS, SMC etc |
Hot Runner System | Mold-masters, HASCO, Husky, Synventive, Incoe, DME, Ewikon, Spear, Thermoplay, Master Tip, Yudo, HRS, Mould-tip etc. |
Mold Steel Heat Treatment | Vacuum heat treatment, Quenching, Tempering |
Mold Surface Treatment | Carburizing, Nitriding, Electroplating (Chrome, Nickle, Gold, Silver) |
Gate Type | Open gate, Side gate (Edge gate), Sub gate, Pin point gate, Valve gate, Banana gate, Direct gate, Fan gate etc |
Hydraulic Cylinder | PARKER, TAIYO, STAUBU, JUFAN etc |
Mold Surface Finish | Polishing (SPI standard A0-D3), Matte (VDI standard 12#-45#), Texture (Mold-tech, Yick Sang, NiHon etc) |
Product Surface Finish | Painting, Silk-screen, Pad printing, Electroplating, Thermal Bonding, Ultrasonic Welding, Hot Stamping, Heat Transfer, Water Transfer, Laser etching etc. |
Green Vitality was established in 1993 with 6 employees. With the development for 30 years, we have become a reliable supplier as well as a strategic partner of customers worldwide to provide the most efficient solutions for their applications for plastic products. We will continue the mission to be a world-class expert in mold making industry.
We supply one stop service from initial product design to final parts mass production from DFM analysis, Mold flow analysis, part optimization, mold design, mold manufacturing, plastic parts injection molding, surface finish, assembly, labeling and packaging. Helping many customers to develop new projects successfully and meet their their big demand on mass production with post molding service.
Should you have any inquiry please feel free to contact us, we can send you free DFM analysis and fast quotation.
Business Scope: | ||||
GV Service Scope | Mold Application | Plastic Material Used | ||
Prototype mold | Electronic Products | ABS | PA6/66/12+GF | TPE/TPU/TPR |
Production mold | Home Appliance | PP | PPA | PBT |
Double shot mold | Industrial Products | PE | PMMA | PC+ABS |
Overmold, Insert mold | Daily Commodities | PC | POM | PP+GF |
Big Blow mold | Marine and Vessel | PS | PPO | POM+GF |
Die casting mold | Medical Device | PVC | PCTG | PC+GF |
3d printing, CNC machining | Auto Parts | PET | PSU | PA+GF |
Silicone vacuum replica | Bathroom Products | PETG | SAN | ABS+GF |
Injection Molding Production | LED and Optics | PEI | HIPS | PBT+GF |
Post molding service | Pipe Fitting and Toys, etc | AS, ASA | PEEK | PSU+GF etc |
Mold Standard | Software | Hot Runner Brand | ||
DME | CAD/CAM | Yudo | DME | Husky |
HASCO | UG/Solidworks/Pro-E | HASCO | Incoe | Punch |
JIS | Catia | Mold Master | Syventive | MOULD-TIP |
Mold Processing Equipment (21sets) | Inspection Device | |||
CNC*5, Milling machine*4, EDM*5, Mirror EDM, Grinder*4, Lathe, Driller | CMM | Height Gauge | Marking Gauge | |
Injection Molding Machine (23sets with robot arm) | Plastic Parts Specification | |||
80T*2, 90T*2, 120T*6, 130T*2, 160T*6, 200T*2, 250T, 260T, 400T | Thinnest thickness 0.37mm, weight 0.1g~5KG |
The injection molded parts we make ranging from different industries, auto parts, home appliance, electronic products, industrial products, daily commodities, sanitary, machinery parts, medical device, toys and many other industries.
We use original branded plastic material to produce high quality plastic molded parts with advanced injection molding machines and automatic production equipment and robot arm.
Plastic material brands we use are Sabic, Dupont, Chimei, Arkema, Formosa, Sumitomo, LG etc.
Plastic raw materials are ABS, PP, PC, PE, PA, POM, PMMA, PET/ PETG, PEEK, PS, PVC, PEI, AS, ASA, PPA, PPO, PCTG, PSU, SAN, HIPS, TPE/TPU/TPR, PBT, PC+ABS, PP+GF, POM+GF, PC+GF, PA+GF, ABS+GF, PBT+GF, PSU+GF etc.
Welcome your visit and cooperation. Your success is our persuit.
FAQ:
Q1: Are you trading company or manufacturer?
A1: We are direct factory for making mould with experience for 30 years.
Q2: Where is your factory located?
A2:Green Vitality is located in Shajing, Shenzhen City, Guangdong Province, China.
40 minutes from Bao 'an International Airport by car, 45 minutes from train station to our factory.
Q3: What we need for mould quote?
A: Usually we need the following information,
(1) Mould steel raw material you require or mould life you require.
(2) Mould cavity no. you want?
(3) 2D or 3D product drawing, or pictures with detail sizes (length, width, height, thickness), or send samples directly to us.
(4) Raw material of the product.
(5) Hot runner or cold runner, if hot runner which brand of hot runner you require.
Q4: How about quality control in your factory?
A: We believe "Quality comes before everything". We mainly do the following procedures:
(1) Design Optimize Control
(2) Mould steel hardness Inspection
(3) Mould assembly Inspection.
(4) Mould trial samples inspection.
(5) Final inspection for mould & packing before shipment
Q5:How long is the lead-time for a mould?
A5:It depends on the mould's size and complexity. Usually, the lead-time is about 25-45 days.
Please send 3D/2D drawings or samples to us if you have any queries with regards to the above.
Through our turnkey solution for your project, we can help you cut cost up to 50%!
Suppliers with verified business licenses